Mold information

How to Make Air Cooler Mould of Higher Quality

Update:25-04-2019
Summary:

1. The design and manufacturing cost of each Air Cooler […]

1. The design and manufacturing cost of each Air Cooler Mould must be summed up in time: through the effective control of the workshop, effectively control the scrapping of the work order, through accurate mould structure design, efficient mould part processing and accurate zero parts inspection, Effectively reduce the additional cost of the mould due to replacement and maintenance, thus obtaining the actual cost of each set of moulds, effectively controlling the quality mould.

2. Develop a complete and practical air cooler mould production management system: develop a complete mould production management system, realize product information management, process data management, plan management and schedule management computer information management system. Including mould production planning, mould design, process development, shop task assignment and product inspection, warehouse management, etc., so that mould manufacturing and related auxiliary information from planning to completion of delivery can achieve comprehensive tracking management.

3. Maintain air cooler mould drawings, process and physical data consistency and integrity: ensure the consistency and integrity of mould drawings, processing technology and physical data through effective, meticulous and rigorous testing methods.

4. Overall planning: Plan and integrate and integrate planning, design, processing technology, workshop production, human resources and other information, coordinate planning, effectively coordinate planning and production and effectively ensure mould quality. On time delivery.

5. Establish processing technology preparation: establish processing technology preparation, summarize two-colour mould parts list, purchase parts list, standard parts list, self-made parts list, self-made standard parts list, material list, heat-treated parts list, convenient loss list and mould cost, Make sure the relevant resources are in place. Combine production planning management and schedule management to ensure that relevant equipment is used effectively, to prevent personnel from being idle, and to link all aspects of processing and manufacturing.

6. Establish quality inspection department: Strictly standardize inspection methods, eliminate “almost” luck, and ensure the accuracy of various parts of air cooler mould processing. Effectively control mould quality and effectively correlate quality with individuals based on top and bottom process records. It enhances the operator's design and responsibility.